CII Performance · Njord Digital Platform
How the IMO's yearly carbon rating works, what sits behind an A–E score, what it means for shipowners, and how Njord turns reported numbers into reviewed CII intelligence.
What is CII
The Carbon Intensity Indicator is the IMO's operational measure of how much CO₂ a ship emits for the transport work it does. Under MARPOL Annex VI regulation 28, ships of 5,000 GT and above in scope calculate an attained CII every calendar year and receive a rating from A (best) to E.
It's built from data already reported under the IMO Data Collection System. At Njord, that data goes through a technical review before it becomes the CII position you act on.
Vessel data
Reports · fuel · BDNs
Njord review
Evidence · factors · checks
Published CII
Cut-off · attained · band
Year-end BAU
Projection · confidence
Verified inputs before client-facing intelligence.
The process
The IMO splits the method across five guidelines, G1 to G5. Each step builds on the one before, so a small error early on carries through to the rating. Click a step to expand it.
01 · Collect operational data
Fuel consumed by type, distance travelled and hours underway are recorded through the calendar year and reported under the IMO Data Collection System (DCS). Noon reports, bunker delivery notes (BDNs) and fuel records are the evidence behind every figure.
This is where most CII problems start: a missing report, a duplicated event or a bunker that doesn't match the logs all flow straight into the result.
02 · Calculate the attained CII (G1)
Each fuel's consumption is multiplied by its fuel-specific CO₂ conversion factor. Total CO₂ is then divided by the ship's capacity (deadweight or gross tonnage, depending on ship type) and the distance travelled, giving grams of CO₂ per capacity-tonne per nautical mile.
The formula is simple. Getting the inputs right is not.
03 · Apply corrections and adjustments (G5)
The G5 guidelines allow certain voyage adjustments and correction factors, for example for specific ship-type energy uses or particular operating conditions, where the rules permit them.
Whether a correction applies is a ship-specific question, not something to assume from a generic profile.
04 · Set the required CII (G2 + G3)
Each ship type has a 2019 reference line based on its size (G2). The year's reduction factor, Z (G3), is applied to that line to give the required CII the ship is measured against.
Z rises every year: 11% in 2026, then 13.625%, 16.25%, 18.875% and 21.5% for 2027–2030 under MEPC.400(83).
05 · Rate the ship A to E (G4)
The attained CII is compared with the required CII using ship-type boundaries (d1–d4). Band C sits around the required CII; A and B are better, D and E worse.
Because the required CII tightens each year, a ship that runs exactly the same way will gradually slide down the scale.
06 · Verify and record
The flag Administration or a Recognised Organisation verifies the reported data and records the attained CII and rating on the ship's annual Statement of Compliance, which is kept on board.
What it means for shipowners
A ship rated E in one year, or D for three consecutive years, must add a corrective action plan to its SEEMP Part III, verified before the next Statement of Compliance is issued. Charterers, financiers and cargo owners increasingly ask about CII too.
AMajor superior
Well ahead of the required CII. A strong position in commercial conversations.
CompliantBMinor superior
Better than required, with some buffer against next year's tighter target.
CompliantCModerate
Around the required CII. Compliant today, but the bar moves every year.
CompliantDMinor inferior
Below requirement. Three D ratings in a row trigger a corrective action plan.
WatchEInferior
A single E rating requires a corrective action plan in SEEMP Part III, verified before the Statement of Compliance.
Action planHow Njord helps
Automated indicators are useful for frequent monitoring. Njord adds a deliberate technical assurance layer between your operational reports and the CII position you use for decisions.
Njord specialists review vessel reports, fuel records and BDN evidence, then investigate exceptions and applicable factors.
Calculation basis, fuel factors, exemptions and cut-off date are assessed for your vessel rather than assumed from a generic profile.
Every reviewed CII comes with a business-as-usual year-end projection and an indicative rating.
01
Review the vessel records
Check report continuity, fuel and distance consistency and possible duplicate or missing events. Match BDN and fuel evidence where applicable.
02
Determine the calculation basis
Review ship type and capacity, fuel-specific CO₂ factors, reporting dates and eligible voyage adjustments or correction factors.
03
Investigate the differences
The platform independently reconciles results; our team resolves or flags material discrepancies and keeps their status visible.
04
Publish with context
Each position has a defined reporting cut-off, attained CII, rating, validation status and an indicative year-end outlook.
The CII module
CII Performance sits alongside Njord Navigator, Compliance and Score on the Njord Digital Platform. It turns Njord's reviewed data into a fleet register, year-to-date tracking and a year-end projection for every vessel.
Client Fleet CII View
Read-only cumulative YTD monitoring and screening-grade year-end projection.
FLEET REGISTER
| VESSEL | IMO | CUT-OFF | CURRENT | PROJECTED | TREND | ACTION |
|---|---|---|---|---|---|---|
| NORDIC TERN | 9•••••3 | 2026-09-30 | 16.360 / E | 16.541 / E | ▼ Deteriorating (+5.4% annualised) · corrected | Contact Njord for CII / CAP Review |
| SEA LANTERN | 9•••••0 | 2026-08-25 | 5.462 / B | 5.285 / B | ≈ Stable (+0.7% annualised) · corrected | – |
| KESTREL BAY | 9•••••9 | 2026-10-31 | 7.104 / C | 6.982 / C | ▲ Improving (−3.1% annualised) · corrected | – |
| HALDEN STAR | 9•••••4 | 2026-10-31 | 17.539 / D | 17.892 / D | ▼ Deteriorating (+9.7% annualised) · corrected | Contact Njord for CII / CAP Review |
| FJORD RUNNER | 9•••••2 | 2026-10-31 | 10.478 / D | 10.478 / D | ≈ Stable (+0.0% annualised) · corrected | – |
| GREY HERON | 9•••••8 | 2026-10-31 | 18.905 / D | 19.228 / D | ▼ Deteriorating (+6.7% annualised) · corrected | Contact Njord for CII / CAP Review |
ACTUAL-TO-PROJECTED CUMULATIVE CII TRAJECTORY
NORDIC TERN · Actual data to 2026-09-30 · corrected basisSample data. Explore the live interface in the platform demo.
Every vessel with its cut-off date, current YTD CII and rating, projected rating and trend. Search by name or IMO, filter by projected rating.
Cumulative CII month by month against the A–E bands, with the projection to 31 December beyond the data cut-off.
Vessels heading for D or E are flagged with a direct route to a Njord CII and corrective action plan review.
One CSV with vessel and IMO, cut-off, actual and required CII, indicative year-end CII and band, confidence and comments.
Next step
See the CII Performance module on the Njord Digital Platform, or talk to our team about a reviewed position for your fleet.